Deploy and manage DCM Projects¶
This topic describes how to create and deploy DCM Projects to manage Snowflake environments, including accounts.
Managing a DCM project involves the following steps:
- Prepare your Snowflake account for a DCM project.
- Define project configuration and objects in project files.
- Create a DCM Projects object.
- Plan to preview proposed changes before deployment.
- Deploy the project.
- Maintain the project by monitoring, updating, and repeating the process as needed.
You can continuously deploy incremental changes to your project as well as large-scale account infrastructure changes.
Prepare for a DCM project¶
To get started with DCM Projects, your Snowflake account must satisfy the following prerequisites:
- A database and schema where you can create your DCM Projects object
- A role with privileges to create a DCM Projects object and access to run queries on a warehouse
- For Snowflake CLI, a role with privileges to create a temporary stage
This section describes the tasks that you need to complete to prepare for DCM Projects:
- Install interfaces to use with DCM Projects if you want to use Snowflake CLI or Cortex CLI.
- Configure Git integration (recommended but not mandatory)
Interface tools¶
You have the following interface options available for DCM Projects.
| Interface tool | Best for |
|---|---|
Snowsight A workspace in Snowsight is a Snowflake native cloud IDE in your account. |
|
Local IDE with Snowflake CLI The most familiar and personalized interface for software engineers. |
|
Cortex Code An agentic AI tool for Snowflake. See Cortex Code for DCM Projects for more information. |
|
| SQL commands |
|
The following diagram shows how these interfaces fit into a typical development-to-production workflow.

Cortex Code for DCM Projects¶
Cortex Code is an agentic AI tool for Snowflake. With the DCM skill enabled, Cortex Code can autonomously create, migrate, debug, and deploy DCM Projects. It can also work alongside you step by step. The DCM skill is available in any Cortex Code environment, including Cortex Code CLI, Cortex Code in Snowsight, the Snowflake extension for VS Code (https://marketplace.visualstudio.com/items?itemName=snowflake.snowflake-vsc), and Cortex Code Desktop.
The Cortex Code DCM skill enables the following:
- Scaffold a new DCM project from scratch, including the manifest file, the folder structure, and definition files.
- Author and edit DEFINE statements, Jinja templates, and macros.
- Run PLAN, DEPLOY, TEST, and PREVIEW commands.
- Interpret plan output, diagnose failures, and suggest fixes.
- Download and inspect deployment artifacts.
- Navigate and explain an existing DCM project.
To get started with the Cortex Code DCM skill, use one of the following options:
- Snowsight Workspaces: Open Cortex Code in the Workspaces sidebar while editing your project files, as described in Cortex Code in Snowsight.
- Cortex Code CLI: Install Cortex Code CLI as described in Installing Cortex Code, then start Cortex Code in your terminal.
- VS Code extension: Use the Snowflake extension for VS Code (https://marketplace.visualstudio.com/items?itemName=snowflake.snowflake-vsc) to work with Cortex Code directly from your editor.
- Cortex Code Desktop: Run Cortex Code as a standalone desktop application connected to your Snowflake account. See Cortex Code Desktop.
In any of these interfaces, use the $dcm skill reference or the term DCM in your natural language prompt.
For example:
- “Create a new DCM project for our analytics pipeline”
- “Plan my project against the PROD target”
- “Why did my last plan fail?”
- “Add a new dynamic table definition for customer spending”
Snowflake CLI for DCM Projects¶
Snowflake CLI is a command-line interface for Snowflake. It is a tool that you can use to interact with your Snowflake account from your local IDE.
-
DCM Projects require Snowflake CLI version 3.24.0 or higher for the commands and options documented in this guide. Install or upgrade Snowflake CLI as described in Installing Snowflake CLI.
-
Configure your connection to your Snowflake account, as described in Configuring Snowflake CLI and connecting to Snowflake. Confirm you have a working connection:
For more information about how the CLI resolves project targets separately from the active connection and role, see Project identifier resolution.
-
Navigate to the local directory of your Git repository clone. For example:
-
See the Snowflake CLI DCM commands available to you:
Git integration¶
Connect to the Git repository where your DCM project definition files are stored.
-
Create or select a Git branch for your planned changes.
Snowflake clones files from that branch into your workspace editor.
-
Navigate to the folder where you have your DCM project definition files or want to create them.
-
The Snowflake extension for VS Code is not needed here, but can be helpful.
-
Connect to your Git repository.
- Connect your local IDE to your remote Git repository.
- Create or select a branch for your planned changes.
- Clone that branch to your local disk.
- Navigate to the folder where you have your DCM Projects definition files or want to create them.
Create a DCM project¶
Required roles and privileges¶
The role of the user who creates a DCM project object must have the following roles and privileges:
- The CREATE DCM PROJECT ON SCHEMA privilege:
Create a DCM project¶
Create a DCM project object by using one of the following options.
To create a project for a non-default target, use one of the following commands:
-
In the navigation menu, select Projects » Workspaces.
-
In the Workspaces pane, select + Add new » DCM Project to create a new DCM project folder.

-
Select Define default target environment to select or create a new DCM project object for the default target in the manifest.
When running DCM PLAN against a target that has a DCM project object defined in the manifest, but does not yet exist, the UI prompts you to confirm creation of that DCM project object based on the defined name and owner role before executing the plan.
-
The status indicator next to Target shows whether the specified DCM project object is ready to use. Open the target selector to see the status and message for each target.
- Green: The DCM project object exists and can be used to run PLAN or DEPLOY.
- Yellow: The object exists, but the
project_ownerrole doesn’t have access to this workspace. - Red: The object can’t be used yet, because the project name isn’t a valid fully qualified name,
manifest.ymlis missingproject_owner, or the object doesn’t exist or isn’t accessible to theproject_ownerrole. - Gray: Snowflake is still checking the object’s status.

Access control and role privileges¶
You can set role-based access control (RBAC) of the schema-level DCM project object to READ, MONITOR, or OWNERSHIP privileges.
These privileges are independent of the access control for definition files stored in a workspace, stage, or repository.
| Privilege | Description | Allowed operations |
|---|---|---|
| READ |
This means you need both |
|
| MONITOR |
|
|
| OWNERSHIP |
|
|
Ownership on DCM-managed objects¶
The role that deploys a DCM project, by default, has the OWNERSHIP privilege of all deployed objects.
Project definitions can transfer ownership to other roles. To prevent owner lockout, the DCM project owner role must hold the role that receives ownership. For the complete definition pattern and its limitations, see OWNERSHIP grants.
DCM PLAN and DEPLOY actively check for potential owner lockout and fail before making any changes if a GRANT OWNERSHIP statement on a
managed object points to a role that the project owner role doesn’t hold. This is a safety check, not a side effect: DCM prevents the
lockout from happening in the first place.
The situation where the project owner is already locked out of a managed object only occurs when a privilege was revoked from the project owner role manually outside of DCM. In that case, the next PLAN or DEPLOY will fail because the current state no longer matches what DCM expects. To recover, restore the required ownership or role hierarchy outside of DCM.
For an intentional management handoff, first use the documented detach workflow with a role that has the required privileges, and then remove the definition before redeploying. Removing a definition without first detaching the object expresses intent to drop the managed object; it isn’t a recovery method for owner lockout.
If you want to migrate existing objects to be managed by a DCM project, the role that owns the DCM project object also has to have ownership privileges (direct or inherited through other roles) on the object to be managed by DCM project.
Note
If an object is migrated, we recommend adding the corresponding GRANT OWNERSHIP statement to the project definitions as well to ensure that the current state and DCM project definitions are in sync.
Define a DCM project¶
A DCM project is based on a manifest file and one or more SQL object definition files. These files are typically stored and managed in a Git repository or your local workspace.
-
The manifest file
- Specifies one or more target environments with corresponding account identifiers, DCM project objects, owner roles for these objects, and optional templating configurations
- Optionally, specifies templating defaults and one or more configurations with values for template variables.
-
The object definition files
- Define a group of Snowflake objects, grants, and expectations that you want to manage together in this DCM project.
See Create a DCM project folder to store your definition files for how to set up a DCM project folder and the definition files and how to use templates to define your DCM project.
Plan a DCM project¶
Planning a DCM project performs a dry run to preview changes before deployment. Snowflake compares your project definition files to existing objects and shows which objects will be created, altered, or dropped. No changes are made to your account.
Use planning to review and validate changes before deploying a DCM project. You can specify options such as a configuration or an output path for plan results.
The PLAN mimics the DEPLOY command as much as possible, except it doesn’t actually execute any DDL statements. Because PLAN closely mirrors DEPLOY, it requires the same OWNERSHIP privilege on the DCM project as DEPLOY, even though no changes are applied. This way, a dry run surfaces privilege errors before deployment.
Important
Always run the PLAN command on your projects before deployment to help ensure there are no errors from syntax, templating, object dependency, access privileges, and so on. Review the plan output to debug any errors, preview the rendered Jinja with the provided variables, and preview the changes that will be made once you deploy.
The plan performs the following steps:
- Renders all Jinja templating with the selected configuration profile or values provided at runtime.
- Compares all definitions against the current state of entities that were defined as part of the last deployment.
- Converts all defined statements into CREATE, ALTER, DROP, GRANT, and REVOKE statements.
- Sorts all statements based on their interdependencies.
- Compiles all statements.
Note
Although PLAN catches almost all possible errors that can occur during deployment, it does not guarantee a successful deployment.
Run the PLAN command¶
The PLAN command takes the following information as input:
-
The path to the manifest file
The CLI reads the target from the manifest (
default_targetor--targetflag). For SQL commands, the path to the manifest file and the project name must be provided. -
Defined values for Jinja variables (optional).
-
The target’s
templating_configautomatically selects the configuration profile. For SQL commands, use the USING CONFIGURATION clause to specify the profile. -
One or more values of the configuration profile to overwrite (optional).
The following are examples of how to run the PLAN command.
Run the snow dcm plan command in your local IDE terminal or as part of a Git workflow.
An example of a CLI command to plan a DCM project from a local directory is:
An example of a CLI command to plan a DCM project from local files by using a non-default target is:
An example of a CLI command to plan a DCM project with optional arguments is:
Variables must be enclosed in double quotes, with additional single quotes for string values. Lists of values require square brackets.

To open the DCM project pane, select Show project controls on your project folder in the file explorer. Then, at the top of the pane:
-
Select your project from the project switcher in the pane tab.

-
Select your target (if you have multiple targets).
-
In the operations list, select Plan.
-
(optional) To overwrite specific variable values for this run, turn on Override Variables in the same list. This option only appears when the selected target declares a
templating_configinmanifest.yml. -
(optional) Select Delta under Plan Mode to only evaluate definitions that changed since the last deployment. See Plan only changed definitions (PLAN DELTA) for details.
-
Click the run button to start the plan.
-
The Snowsight UI automatically uses the DCM project object defined in the manifest target. If the project object does not yet exist, you can create it from the UI.
When the PLAN is completed, the output opens in a new tab. If you don’t see it, select View Last Plan in the operations list. This option appears once a plan exists, and it opens the existing output without re-running the plan.
If a Plan already exists, you can choose to re-plan if you have changed your definitions.
The plan output is always generated automatically under the project sub-folder out/.

You can execute a DCM PLAN in SQL from anywhere you can run SQL commands, inside Snowflake or connected to Snowflake. Use the
EXECUTE DCM PROJECT command with the PLAN mode.
An example of a SQL command to plan a DCM project from a Workspace path is:
An example of a SQL command to plan a DCM project when using Jinja with configuration profiles but overwriting wh_size and teams is:
An example of a SQL command to plan a DCM project when using Jinja templating without configuration profiles is:
Plan only changed definitions (PLAN DELTA)¶
PLAN DELTA is a faster variant of PLAN for validating incremental changes to an existing project. Instead of checking all definitions against the current account state, PLAN DELTA only evaluates the definitions you changed and any downstream definitions in the project that depend on them.
Use PLAN DELTA during active development to get faster feedback on your edits. Because it skips unchanged definitions, it doesn’t detect changes that happened outside of DCM Projects on your account since the last deployment (for example, a view dropped or altered by another user). Always run a full PLAN before deploying to ensure no external changes will cause a deployment failure.
In the DCM project pane, select Plan in the operations list, select Delta under Plan Mode, then click the run button.

See EXECUTE DCM PROJECT for the full syntax.
Definition file path¶
You have the following options to reference the location of the manifest and definition files.
-
From a Workspace path
The Snowsight user interface automatically lists all DCM project definitions inside the current workspace. You can select one of these paths and workspaces will use it to run DCM commands.
If you want to manually run SQL commands in workspaces, you can also refer to that same path inside any of your workspaces.
Tip: The 3-dot menu next to every file in your workspace lets you copy the full path to that file into your SQL code.
An example of a SQL command to plan a DCM project from a workspace path is:
-
From a local Git repository clone on your disk
Select the directory that contains your
manifest.ymlfile before running the CLI command in your local IDE. Alternatively, you can specify a different local directory that contains the manifest and definitions you want to use.An example of a CLI command to plan a DCM project from the current directory of a local Git repo:
An example of a CLI command to plan a DCM project from a different directory in a local Git repo clone:
-
From your remote repository in a workflow
The same CLI syntax can be used when the DCM commands are executed in a CI/CD workflow. You can call the CLI directly or use the reusable GitHub Actions from the snowflake-labs DCM repository, which handle CLI setup, authentication, and DCM commands internally.
An example using the reusable
dcm-planaction: -
From a Stage or Git repository clone in Snowflake
If you want to run a PROCEDURE or TASK inside Snowflake that runs DCM commands, this SQL command can reference an absolute path to a Snowflake stage or Git repository clone inside the account.
For Git repository clones, consider first running ALTER GIT REPOSITORY FETCH to get the latest version.
'@...'paths can only be used when executing DCM SQL commands.An example of a SQL command to plan a DCM project from a Stage or Git repository clone in Snowflake is:
Plan output¶
For the PLAN and DEPLOY output format, including the JSON schema and examples, see the PLAN and DEPLOY output section of the EXECUTE DCM PROJECT command reference.
Deploy a DCM project¶
When you deploy a DCM project, the following actions are performed:
- Objects that are defined but don’t exist yet are created.
- Objects that already exist but differ from the current definition are altered.
- Objects that already exist as defined are skipped.
- Objects that already exist but are no longer defined are dropped.
The same behavior applies to grants and attached data quality expectations defined in the project.
Important
To avoid any unintended data loss, always run and review your PLAN output before running DEPLOY.
Each DCM project can only have one instance deployed at any time. Multiple configuration profiles can’t coexist. Deploying configuration B with the same DCM project will drop any objects from other previous configurations that are not defined in B.
Create one DCM project for each target environment. The DCM project for each environment can then point to the same definition files, but
deploy independently with different values for each variable, like suffix => 'DEV_JS', so that they can exist
independently side-by-side on the same Snowflake account.
You can overwrite values for selected variables at runtime if you want to use a pre-defined profile with a slight variation.
For example:
Each deployment attempt (executing, successful, failed, or canceled) has a deployment number, for example DEPLOYMENT$1. Optionally you can
specify a unique string as a deployment alias to name individual deployments for better observability in the deployment history.
Think of the deployment alias like a commit message for your code change.
Each DEPLOY command first runs an internal COMPILE and PLAN as part of the deployment. If the PLAN succeeds, DEPLOY is executed
directly afterwards. There is no option to intercept or review this internal plan step. The PLAN is executed to further
reduce the risk of failure during the deployment.
DEPLOY reconciles the submitted definitions with the current account state and computes a fresh changeset. It doesn’t replay a previously
saved PLAN result. Intervening account changes can therefore change the deployment changeset even when the submitted definitions are
unchanged.
If DEPLOY fails, you can see in the error message if it failed during the RENDER, COMPILE, PLAN or DEPLOY step.
Failure during any step before DEPLOY step is similar to PLAN: No DDL changes are executed.
Important
Failure during the DEPLOY step can result in partial execution of the defined changes. This can potentially cause some of the managed objects to be in an undefined state. In most cases, fixing the root cause and executing DEPLOY again restores the defined target state. To apply an earlier definition state through a new reconciliation, see Recover an earlier defined state.
The target path for the DEPLOY output file can’t be customized. Deployment artifacts are always stored inside the DCM project.
Run the DEPLOY command¶
To execute the DEPLOY command, provide the following inputs:
- The path to the manifest file.
- A configuration profile must be named if configuration profiles are defined in the manifest.
- Optionally, values for the configuration profile overriding the default values.
- Optionally, a deployment alias.
The following are examples of how to run the DEPLOY command.
An example of a SQL command to deploy a DCM project when using Jinja with configuration profiles but overwriting wh_size and teams is:
You can run snow dcm deploy either in your local IDE terminal or as part of a Git workflow.
An example of a CLI command to deploy a DCM project from a local directory is:
An example of a CLI command to deploy a DCM project targeting a non-default environment is:
An example of a CLI command to deploy a DCM project with optional arguments is:
-
In the navigation menu, select Projects » Workspaces.
-
Select your project from the project switcher in the DCM project pane tab.

-
Select your target (if you have multiple targets).
-
In the operations list, select Plan, then click the run button.
The UI will automatically use the DCM project object defined in the manifest target. If the project object does not yet exist, you can create it from the UI.
-
Once the PLAN is completed, the output opens in a new tab. If you don’t see it, select View Last Plan in the operations list. This option appears once a plan exists, and it opens the existing output without re-running the plan.
If a Plan already exists you can choose to re-plan if you have changed your definitions.
-
Review your PLAN output to ensure it does not contain unintended changes.
-
In the operations list, select Deploy, then click the run button to execute the deployment with the same target and values from PLAN.
See PLAN and DEPLOY output for the standard plan output structure.
Manage a DCM project¶
Show objects and grants managed by a DCM project¶
The SHOW ENTITIES IN DCM PROJECT command allows you to see a list of all Snowflake objects that are currently managed by a specific DCM project. It provides a list of fully qualified names for all objects. To see the results, you need both READ privilege on the DCM project and privileges to see the managed object itself.
Note
The result does not necessarily match the objects of the most recent deployment. Objects that were manually dropped or detached from the project are not listed in the result.
You can use LIKE to search by name or use a flow operator to further process or filter the result set.
Similarly, the SHOW GRANTS IN DCM PROJECT command lets you list the grants that are defined and deployed with the DCM project.
Use SHOW GRANTS IN DCM PROJECT to list grants that are currently deployed and managed by the project, or SHOW FUTURE GRANTS IN DCM PROJECT to list grants that will be deployed and managed by the project the next time it’s executed.
Examples to see the objects and grants that are currently managed by a DCM project:
- In the navigation menu, select Catalog » Explorer.
- Navigate to the schema that contains the DCM project object.
- Select the DCM project object to see its details.
- Select the Objects tab to see a list of all Snowflake objects currently managed by this project object, or select the Grants tab to see a list of all grants currently managed by this project object.
- Click the name of an object to open that object’s details page in a new tab.
Detach objects from a DCM project¶
Using the ALTER <object> command with the UNSET DCM PROJECT clause, you can detach an object that was deployed and is now managed by a DCM project. The command removes the association between the object and the DCM project without dropping the object. You can use this command when you want to start managing an object by a different DCM project.
Make sure to remove the corresponding DEFINE statement from your project definition files before you deploy it again. Otherwise, the object will be reintegrated into the DCM project.
An example of a SQL command to detach an object from a DCM project:
Detach grants from a DCM project¶
ALTER DCM PROJECT ... UNMANAGE GRANT removes a grant from a project’s management scope without revoking the underlying privilege. The grant remains exactly as it is: only the project’s tracking of it is removed.
Use UNMANAGE GRANT when you want to:
- Transfer a grant to a different project or to manual management.
- Clean up stale grant references after an external change: for example, someone outside DCM revoked a privilege.
This is different from removing a grant definition and redeploying. DCM interprets a missing grant definition as intent to revoke, and revokes the grant on the next deployment.
Required privileges¶
The role executing ALTER DCM PROJECT ... UNMANAGE GRANT must have OWNERSHIP on the DCM Project object.
No REVOKE privilege or ownership of the target resource is required: the role only needs to be able to see the grant and the securable object.
This means you can clean up grant references even after another role has removed your access to the managed resources.
Syntax¶
<grant_specification> uses the same grammar as a GRANT <privilege> statement. Write it exactly as you would write the GRANT line in your DCM definition files, omitting the leading GRANT keyword.
Return value¶
On success, the command returns a message that includes the count of unmanaged grants, for example:
Next steps after unmanaging¶
After running UNMANAGE GRANT, remove the corresponding GRANT statement from your project definition files before the next deployment. If you leave it in place, DCM reintegrates the grant on the next EXECUTE DCM PROJECT run.
Error handling¶
The command returns an error if:
- The referenced grant or securable object doesn’t exist or isn’t resolvable.
- The role doesn’t have
OWNERSHIPon the DCM Project. - The role can’t see the referenced securable object.
The command doesn’t fail silently: every error is reported so you can confirm exactly which grants were unmanaged.
Purge a DCM project¶
When you create temporary DCM project objects as development sandboxes or for demos, the EXECUTE DCM PROJECT command with the PURGE option lets you clean up the entire project in a single statement. PURGE runs a deployment without any definitions, which drops all entities, revokes all grants, and removes all attachments the project currently manages.
Warning
PURGE is destructive by design. Use it only for non-production projects, such as development sandboxes or demos.
To fully tear down a temporary DCM project, run two commands:
EXECUTE DCM PROJECT <name> PURGEdrops all entities, grants, and attachments the project manages.DROP DCM PROJECT <name>removes the project object itself.
For example:
The purge execution appears in the deployment history of the DCM project, so you can confirm that it ran successfully. For more information about dropping the project object, see Drop a DCM project.
Drop a DCM project¶
When a DCM project object is dropped, all managed entities, grants, and expectations remain in place as “unmanaged”.
Important
Dropping or replacing a DCM project object causes you to lose all deployment history artifacts that the object contains.
- In the navigation menu, select Catalog » Explorer.
- Navigate to the schema that contains the DCM project.
- Select the DCM project to see its details page.
- Click the 3-dot menu in the top right and select Drop.
Automate a DCM project deployment¶
CI/CD best practices¶
Follow these practices when automating deployments with CI/CD pipelines:
- A DCM project targeting a non-production environment should be owned by a different role than its production counterpart to avoid accidental deployments to production.
- A DCM project targeting a production environment should be owned by a dedicated role for production deployments with specifically tailored access
privileges that are just enough to deploy all objects in the project.
-
Avoid using general administrator roles for DCM project ownership. Grant such roles only to service users, not to individual developers.
-
Grant the dedicated production deployment role only to service users, not to individual developers.
-
Restrict the ownership to the production deployment role to ensure immutability of critical infrastructure or data products.
If the dedicated production deployment role grants ownership of production objects to other roles, users who are granted those roles can still modify or drop the production objects.
-
GitHub Actions¶
A set of reusable composite GitHub Actions that automate DCM Projects pipelines is available in the
snowflakedb/snowflake-actions (https://github.com/snowflakedb/snowflake-actions) repository on the
GitHub Marketplace (https://github.com/marketplace/actions/snowflake-actions#github-actions-for-dcm-projects).
Each action handles one step of the lifecycle, and you can compose them to build end-to-end CI/CD pipelines.
Note
These reusable actions are only available for GitHub. The same CI/CD concepts apply to Azure DevOps, GitLab CI/CD, Bitbucket Pipelines, and other providers. Only the workflow syntax differs. No published actions are available for those platforms yet. Consider building your own workflows using a coding agent such as Cortex Code.
The following reusable actions are available: dcm/parse-manifest, dcm/connection-test, dcm/plan, and dcm/deploy.
For setup instructions, input/output documentation, and sample workflows, see the
GitHub Marketplace listing (https://github.com/marketplace/actions/snowflake-actions#github-actions-for-dcm-projects).
To use an action in your workflow, reference it with:
Authentication¶
OIDC (OpenID Connect) is the recommended authentication method for CI/CD pipelines because it uses GitHub’s built-in identity tokens and requires no stored secrets. For setup instructions and alternative authentication options, see the GitHub Marketplace listing (https://github.com/marketplace/actions/snowflake-actions#authentication).
Sample workflows¶
The GitHub_workflows (https://github.com/Snowflake-Labs/snowflake-dcm-projects/tree/main/GitHub_workflows) directory in the
snowflake-labs DCM repository contains ready-to-use workflow files that compose the reusable actions into complete CI/CD pipelines.
You can copy them into your repository’s .github/workflows/ directory and customize them for your project. For full setup
instructions, see the
sample workflows README (https://github.com/Snowflake-Labs/snowflake-dcm-projects/blob/main/GitHub_workflows/README.md).
All sample workflows read the Snowflake account_identifier and project_owner role directly from the manifest targets,
so that environment-specific configuration lives in the version-controlled manifest.yml rather than in duplicated
GitHub secrets. Only the service user credentials are stored as secrets.
The sample workflows demonstrate the following patterns applicable to any DCM Projects CI/CD setup:
- Manifest-driven configuration: Each workflow reads
account_identifier,project_owner, andproject_namefrom the manifest targets, keeping environment configuration in one place. - Selected
DROPdetection: The deploy workflow checks the savedPLANresult for top-levelDROPentries for databases, schemas, tables, and stages, and blocks the deployment if any are found. This check doesn’t cover every destructiveALTERor nested change, and it doesn’t freeze the fresh changeset thatDEPLOYcomputes. - Sequential stage-to-production promotion: Production deployment starts only after staging deployment succeeds and data quality tests pass.
- Pull request comments: Plan and deploy summaries are posted as comments on the originating pull request.
The following screenshot shows a sample PLAN summary that a workflow posted as a pull request comment.

The deployment workflows use the following sequence for each target:
- Plan: Runs
snow dcm planand summarizes the changeset. - Selected
DROPdetection: Checks the savedPLANfor top-levelDROPentries for databases, schemas, tables, or stages. - Deploy: Runs
snow dcm deploy. - Post-deployment scripts (optional): Runs separate SQL scripts with Jinja variable injection.
- Test expectations (optional): Runs
snow dcm testto validate data quality expectations.
Sample workflow: Test connections¶
- Workflow configuration file: DCM_1_Test_Connections.yml (https://github.com/Snowflake-Labs/snowflake-dcm-projects/blob/main/GitHub_workflows/DCM_1_Test_Connections.yml)
- Trigger: Manual with the
workflow_dispatchevent
This workflow validates that the GitHub Actions service user can connect to every target environment defined in the manifest. Use it when setting up a new repository, onboarding a new account, or debugging authentication issues. The workflow performs the following steps:
- Parses all target names from
manifest.ymldynamically. - Uses a GitHub Actions matrix strategy to test each target in parallel.
- For each target, verifies the Snowflake connection, reports the connected account, user, and role, and checks whether the connected role matches the DCM project owner.
- Reports whether the DCM project object already exists and whether the service user has deployment privileges.
Sample workflow: Test PR to main¶
- Workflow configuration file: DCM_2_Test_PR_to_main.yml (https://github.com/Snowflake-Labs/snowflake-dcm-projects/blob/main/GitHub_workflows/DCM_2_Test_PR_to_main.yml)
- Trigger: Pull request opened, synchronized, or reopened against the
mainbranch
This workflow runs a PLAN against the production target as an integration test for every pull request. It provides reviewers with a summary of the planned changes directly on the pull request. The workflow performs the following steps:
- Runs
snow dcm planagainst the PROD target. - Parses
plan_result.jsonto summarize CREATE, ALTER, and DROP operations grouped by object domain. - Uploads plan artifacts for later inspection.
- Posts the plan summary as a comment on the pull request.
- Fails the check if the PLAN fails, blocking the merge.
Sample workflow: Deploy to Prod¶
- Workflow configuration file: DCM_3_Deploy_to_Prod.yml (https://github.com/Snowflake-Labs/snowflake-dcm-projects/blob/main/GitHub_workflows/DCM_3_Deploy_to_Prod.yml)
- Trigger: Push to the
mainbranch (typically a merged pull request)
This workflow runs the deployment sequence once for the production target. Use it when you don’t need a staging environment or when staging is handled separately.
After deployment, the workflow optionally posts a status summary to the originating pull request.
Sample workflow: Deploy to Stage then Prod¶
- Workflow configuration file: DCM_4_Deploy_to_Stage_then_Prod.yml (https://github.com/Snowflake-Labs/snowflake-dcm-projects/blob/main/GitHub_workflows/DCM_4_Deploy_to_Stage_then_Prod.yml)
- Trigger: Push to the
mainbranch (typically a merged pull request)
This workflow implements a sequential promotion pipeline. Changes are first deployed to staging, validated end-to-end, and only then promoted to production. A staging failure prevents production deployment from starting. A failure after production deployment starts can leave partial production changes, and a test failure occurs after production has changed.
The workflow runs the deployment sequence first for STAGE and then for PROD. Production deployment starts only after all staging steps pass. After all jobs complete, the workflow optionally posts a final status summary to the originating pull request.
Frequently asked questions (FAQ)¶
- How do I rename an existing object?
- Run an ALTER command outside of the DCM project.
- Change the definition.
- Run PLAN to verify that the new definition matches the new state (no change in PLAN).
- Run DEPLOY to save the new state.
- How do I deploy objects that are not yet supported by DEFINE statements?
Provision external prerequisites before
PLANwhen DCM definitions reference objects or files that must already exist for compilation. Run other imperative operations in separate post-deployment scripts afterDEPLOY. These scripts have their own lifecycle and aren’t included in DCM changesets or recovery artifacts.Separately executed scripts can support Jinja2 templating and dry-run. Dry-run renders the Jinja templating but doesn’t verify successful SQL compilation.
For example: